Location:
Qi Dong City, Jiangsu Provice, P.R. China
Owner:
Guanghui Energy Co- Ltd
Contractor:
TGE / YPDI
Year of Completion:
2020
Contract Scope:
EPC
Basic and detailed Engeineering
Fabrication and Delivery
Supervision
Procurement
Construction
Commissioning
Storage Capacity:
160,000 m3
Terminal Capacity:
3 MTPA
Tank Type:
Full containment
Design Code:
EN 14620
EPC of 160,000 m3 LNG Storage Tank
In-situ bored pils with elevated slab
Outer tank facilities and pipe rack from tank to main terminal pipe rack