05290 // LNG Terminal | Guangdong, P.R. China

Guangdong, P.R. China

LNG Terminal including 4 x 160,000 m³ Tanks

Contract Data

Location:

Shenzhen, Guangdong, P.R. China

Owner:

CNOOC Shenzhen Gas Co. Ltd.

Contractor:

Consortium TGE Gas Engineering GmbH (TGE) and Sinopec Ningbo Engineering Co., Ltd. (SNEC)

Year of Completion:

2015

Contract Scope:

EPC

TGE Scope of Work

Engineering of complete tank expansion facility

Procurement of construction materials and equipment

Pre-/Commissioning of expansion facility

Construction of complete facility

Terminal & Storage Tank Data

Storage Capacity:

4 x 160,000 m³

Terminal Capacity:

4 MTPA

Tank Type:

Full Containment

Design Code:

EN 14620-2006

Project Highlights

Local codes and standards to be considered and applied where applicable

Engineering is executed within several engineering entities of TGE and SNEC